drains are flushed out to the front of the home. Covid did not delay LRE much. It was a week-long project. They used 4 catch basins, two battery-backed electric sump pumps, and hard+flexible piping to get the project done. It involved breaking a portion of the concrete patio, a portion of the concrete near the pool pump and on the driveway, and a lot of digging. The work was systematic and done at an even pace with adequate manpower. The cutting and breaking of the concrete was near-perfect, and the redo of the concrete excellent. Zack, Tom, Donovan and the rest of the crew were timely and professional and their work was excellent. Highly recommend!