Click on a photo to enlarge.
Due to ongoing moisture in this rental home near Enid, the VESTA team installed SmartJacks to make sure the floor framing would hold up to their next residence. The wood framing was sagging and beams were failing due to pier construction under the home. not being installed properly.
Our team was able to lift, level, and seal several areas at the Edmond Children's Safety Village. The areas had been sinking and cracking due to water runoff. Our Poly-level injection is a noninvasive and cost-effective solution to lift the areas back to their original position. After the areas were lifted and level, the cracks were sealed with our Nexus pro sealant to avoid any more water and debris getting in the area. Nexus Pro is specifically engineered to withstand weather and have long-lasting flexibility.
This home needed PolyLevel foam injection system installed along the entire slab foundation to put the floor back to it's original position.