Click on a photo to enlarge.
This commercial boiler room in Friona was due for a boiler replacement. However, the concrete slab supporting the existing boiler had several voids beneath it that would be a major risk during the installation process. After contacting Legacy Supportworks, our team used a PolyLevel injection to fill the voids and stabilize the area. The slab is now stabilized and will not sink or move when the new boiler is being installed.