Adirondack Basement Systems dug out a trench around the perimeter of my basement interior, laid stone, and installed plastic gutter system, new sump hole with triple sump pump system. They also installed plastic wall covering that drains any water coming in through the walls into the gutter system. Gutter system was concreted over. Also installed was a dehumidifier system and new basement windows. The project was estimated at 4 days. It took about 3 and 1/2 days. All work was performed professionaly with materials as estimated. The workers cleaned up after themselves and took care to keep things as clean as possible.
Jeff M. of Mechanicville, NY
Tuesday, August 14th